Loading...

Phases and scope of the project

Analysis of the situation, study of possibilities, and subsequent calculation, design, construction, supply, trial period and final delivery

Alt

Cosmetics

BDF Beiersdorf (Nivea)

BDF had SBR physical-chemical and biological treatment facilities which required increasing their capacity

Alt

Production of ice cream-desserts

Helados Estiu SA

HELADOS ESTIU required water treatment facilities that would allow its discharge to the Sanitation of the town of Ribarroja

Alt

Juice industry

Riverbend S.A

RIVERBEND discharges its water to the Santomera joint industrial wastewater treatment plant, together with two other companies, which has anaerobic treatment technology

Alt

Malting industry

Boortmalt S.A (former Cargill)

BOORTMALT required water treatment facilities that would allow its discharge to the Sanitation of the city of Madrid

Riba Smith Group

Industrial food complex

Riba Smith Group S.A.

Riba Smith Group undertook an ambitious project to build a production center for its various food specialties, including bread, meat, dairy and fourth and fifth range